Regulatory deadlinesSB 253: Scope 1 and 2 due Nov 10, 2027 (expected)SB 261: on holdCDP: Window opens Apr 14, 2027 (expected)All deadlines

Your clients’ emissions data, every number traced to its bill.

For sustainability consultants. Send a client one link and they upload bills and invoices, no account needed. Sendrow calculates CO2e with sourced factors. You review every number and freeze a dated snapshot under your own brand.

Electricity, Fresno plant

8.61tCO2e

41,180 kWh × 0.000209 tCO2e/kWh = 8.61 tCO2e

Reviewed by J. Rivera, Feb 17, 2026

eGRID CAMX (California)

0.000209 tCO2e/kWh

EPA eGRID, 2024

Location-based, eGRID subregion CAMX

PG&E electric bill, Mar 2025

Fresno plant

41,180 kWh

pge-fresno-elec-2025-03.pdf

every row links to the bill it came from
Example data. Factor values are illustrative.
click any row, see the bill behind it

Clients / Harbor Valley Foods

Harbor Valley Foods

your client never makes an account

FY2025 data request, sent Feb 3, 2026. 2 of 3 items received.

OverviewData ledgerReviewActivityEnter data
Scope 128.47tCO2e
Scope 2 (location-based)12.55tCO2e
Total41.02tCO2e
the bill is attached to the row
Ledger rows for March 2025. Select a row to see how its number is calculated.
Activity and siteSource documentQuantityFactortCO2eStatus
PG&E electric bill, Mar 202541,180 kWheGRID CAMX (California)0.000209 tCO2e/kWh8.61Reviewed
PG&E electric bill, Mar 202518,849 kWheGRID CAMX (California)0.000209 tCO2e/kWh3.94Reviewed
PG&E gas bill, Mar 20253,120 thermsNatural gas0.0053 tCO2e/therm16.54Reviewed
PG&E gas bill, Mar 2025406 thermsNatural gas0.0053 tCO2e/therm2.15Reviewed
WEX fuel card export, Mar 2025808 galDiesel fuel0.01021 tCO2e/gal8.25Needs review
Valley Fuel invoice #4471, Mar 2025150 galDiesel (stationary equipment)0.01021 tCO2e/gal1.53Reviewed

Click any row to see where its number came from. Example data. Factor values are illustrative.

Three numbers, traced

Each one is an example of what the trace shows at review.

Electricity, with its bill attached

PG&E

Statement for Harbor Valley Foods, Fresno plant

Electric usage: 41,180 kWh

41,180 kWh × 0.000209 tCO2e/kWh = 8.61 tCO2e

Factor: eGRID CAMX (California), EPA eGRID, 2024

the bill is attached to the row

Diesel bought in dollars

Diesel purchases, Mar 2025

Total$3,151.20

$3,151.20 at $3.90 per gallon = 808 gal

808 gal × 0.01021 tCO2e/gal = 8.25 tCO2e

price per gallon kept with the row

A corrected bill

PG&E

Corrected statement: Stockton warehouse, Mar 2025

Electric usage: 19,519 kWh (was 18,849 kWh)

Row 2: 3.94 became 4.08 tCO2e

March: 41.02 became 41.16 tCO2e

FY2025 v2 created at 539.73 tCO2e. v1 unchanged.

the 1 recipient of v1 got an alert

How a request runs

  1. 1. Send a request

    Choose what you need: electricity and gas, fleet fuel, spend, travel or a commute survey. Your client gets one link, in your brand.

  2. 2. Your client uploads

    They upload bills, invoices, fuel card exports or spreadsheets, or type the numbers in, without making an account. Sendrow sends reminders until they finish.

  3. 3. Review every number

    Each row shows its source document, the factor (name, value, source and year) and the formula. Fix or exclude a row and Sendrow logs the change.

  4. 4. Freeze and share

    Approve a dated snapshot and share a PDF in your brand, an Excel export that adds up to the totals, or a read-only link. A shared snapshot never changes. If you correct it later, Sendrow makes a new snapshot and alerts everyone who had the old one.

your brand at the top
Cedar & Pine Advisory

Harbor Valley Foods: FY2025 data request

  • Electricity and gasReceived Feb 12, 2026
  • Fleet fuelReceived Feb 13, 2026
  • Spend dataWaiting (reminder sent Feb 20, 2026)
Drop bills or invoices here

Powered by Sendrow

Dates to plan around

Reporting deadlines and their status
WhenWhatStatusSource
Nov 10, 2027Annual Scope 1 and 2 reports dueExpectedSource
On holdScope 3 reporting on hold after the Ninth Circuit ruling of Nov 9, 2026PausedSource
On holdClimate risk reports on hold after the Ninth Circuit ruling of Nov 9, 2026PausedSource
Apr 14, 2027CDP 2027 response window opensExpectedSource
Aug 25, 2027CDP 2027 final response deadlineExpectedSource
No fixed dateEcoVadis: assessments run all year

Checked Nov 13, 2026.

Got a request from your consultant?

You don’t need an account. Open the link in their email to upload your files. If you lost it, ask your consultant to resend it.

No consultant yet? Get matched

Send your first request.

Add your brand, add a client, send the link.